Skip to content

Reference

Metal Stamping Processes: Operations, Die Types and When Each Fits

A stamping die cuts, bends, forms or draws sheet metal in a press stroke. This page covers the operations, the die types that combine them and the volume where each one starts to pay off.

Stamping operations

Every stamped part is a sequence of these. A die combines several of them, one per station.

OperationWhat it doesWatch for
BlankingCuts the outside shape of the part from strip or sheet.The burr sits on the side away from the punch. The edge has a smooth shear band and a rougher fracture band.
PiercingPunches holes and slots inside the part.Keep hole diameter at or above material thickness. Stainless and hard tempers need more.
Notching and trimmingRemoves metal from an edge or cuts the part to final outline.Trim lines set the burr side and the edge that mates with other parts.
LancingCuts and lifts metal without removing a slug. Makes tabs, louvers and clips.Lanced features can distort the web next to them in thin material.
BendingFolds metal along a straight line with a V, U or wipe die.Springback and grain direction decide the final angle and the minimum radius.
Forming and embossingRaises ribs, dimples and beads that stiffen a flat area or locate a part.Local thinning shows up at sharp radii and deep embosses.
CoiningSqueezes metal under high force to hold a thickness, flatten an edge or sharpen a detail.Needs far more tonnage than blanking the same outline.
ExtrudingPulls a collar from a pierced hole so a screw gets more thread engagement.Common for tapped holes in thin sheet. The collar height is limited by thickness.
DrawingPulls flat metal into a cup, box or shell.Depth per draw is limited, so deep parts need redraws and sometimes an anneal.
Fine blankingClamps the sheet and shears with tight clearance to give a fully sheared edge.Tooling costs more. It suits thick parts such as gears, cams and levers.

Die types

The die type sets the tooling cost, the piece price and how many parts a shop can make per hour.

Single stage die

One operation per press stroke. Parts move between dies by hand or by robot. Low tooling cost, high labor per piece, so it suits short runs and simple parts.

Compound die

Blanks and pierces in one stroke. Parts come out flat and the hole to outline relationship is tight. Limited to flat parts with few features.

Progressive die

A coil strip advances through a row of stations. Each station does one operation and a finished part drops off at the last. The default for high volume parts that stay on a carrier strip.

Transfer die

Parts are cut from the strip early, then fingers move them station to station. It handles larger and deeper parts than a progressive die and allows operations on every face.

Deep draw die

Pulls flat blanks into cups and shells over several draws. Runs as a single die, a progressive set or a transfer line depending on depth and volume.

Fourslide or multislide

Cam driven slides form wire or strip from several directions. It makes springs, clips and complex bends that a press die handles poorly, with low tooling cost.

Which process fits which volume

Typical ranges collected from how shops usually quote. They are not promises. The shop that quotes your part sets the real numbers.

ProcessTypical partTypical annual volumeTypical toolingTypical lead time
Single stage dieSimple flat parts and short runsUnder 50,000$2k to $20k4 to 10 weeks for tooling
Compound dieFlat parts that need flatness and hole to outline accuracy5,000 and up$5k to $40k6 to 12 weeks for tooling
Progressive dieFlat and formed parts with many features50,000 and up$10k to $80k10 to 20 weeks for tooling
Transfer dieBigger or deeper parts that leave the strip20,000 and up$20k to $150k12 to 24 weeks for tooling
Deep drawCups, shells, cans and closed enclosures25,000 and up$15k to $100k12 to 20 weeks for tooling
Fourslide or multislideClips, springs, terminals and wire forms100,000 and up$3k to $20k6 to 12 weeks for tooling
Laser blank plus press brakePrototypes and low volume bracketsUnder 10,000Little or none1 to 4 weeks
Fine blankingThick flat parts with a fully sheared edge50,000 and up$40k to $200k14 to 26 weeks for tooling

Typical design limits

Starting points for a first print review, not specifications. The shop confirms them against your material and temper.

  • Pierced hole diameterAt least 1 times material thickness in mild steel. Use 1.5 to 2 times in stainless and spring tempers.
  • Hole to edgeAt least 1.5 to 2 times thickness, or the edge bulges.
  • Hole to bend lineAt least 2 times thickness plus the bend radius, or the hole stretches into an oval.
  • Inside bend radiusAt least 1 times thickness for ductile steel. Larger for aluminum 6061 and hard tempers.
  • Bend reliefA notch at least as wide as the material is thick, so the metal does not tear at the corner.
  • Flange lengthAt least 2.5 times thickness plus the bend radius, so the flange stays in the die while it bends.
  • First drawA blank to cup diameter ratio of about 1.8 to 2 in mild steel. Anything deeper needs redraws at about 1.2 to 1.4.

Burr height limits and tolerances that cost extra cover the two callouts that move price most.

How a stamped part gets made

From print to shipment. Tooling comes first, so the schedule is set by the die and not by the press.

  1. Review the print

    The shop checks material, thickness, tolerances and features, then flags what raises tooling cost. Most price changes come from this step.

  2. Design and build the die

    The tool room lays out the strip, designs the stations and builds the die with wire EDM, milling and grinding. Typical tooling time is 6 to 24 weeks.

  3. Tryout and first article

    The die runs in the press, samples are measured against the print and the buyer approves them before production starts.

  4. Run from coil

    Coil feeds the press at a set stroke rate. Sensors watch for misfeeds and short feeds while the operator checks parts on a schedule.

  5. Secondary operations

    Parts that need more than the die can do go on to deburring, tapping, welding, plating or assembly.

  6. Inspect and ship

    The shop samples against the control plan, packs against rust and damage and ships against the release schedule.

Secondary operations

Work done after the press when the die cannot do it or when it costs less outside the die. Each one adds handling, and often an outside vendor and a transit leg, so list them on the RFQ.

Read the secondary operations guide

  • Deburring, tumbling and vibratory finishing
  • Tapping and thread forming
  • Spot, projection and laser welding
  • Zinc, nickel and tin plating
  • Passivation for stainless steel
  • E-coat, powder coat and paint
  • Heat treat for spring steel and stress relief
  • Riveting and self-clinching fasteners
  • Assembly and kitting
  • Marking, cleaning and packaging

Frequently asked questions

How do I know which stamping process fits my part?

Four things decide it: annual volume, part size, draw depth and the number of features. High volume parts with many features usually fit a progressive die. Deep cups fit draw dies. Large parts that cannot stay on a strip fit transfer dies. Below a few thousand pieces a year, laser blanking and press brake forming often cost less than any die.

Can one part use more than one process?

Yes. A part can be blanked and formed in a progressive die, then tapped, welded and plated outside the press. Ask each quote to list every operation and who performs it.

Is stamping cheaper than CNC machining?

Per piece, yes at volume, because a die makes a part in one press stroke. The die has to be paid for first, so machining or laser cutting usually wins at low volume. The crossover is often between a few thousand and a few tens of thousands of pieces a year, depending on the part.

Have a print ready? Get matched.

Send the print with material, thickness and annual volume. We match you with up to 3 stamping shops and reply within 24 business hours.